BRIEF DESCRIPTION
Jobs being undertaken by the key personnel of Skyradar Engineering
Nigeria Limited are listed below.
(A) PROJECT: Construction of Gas Station to power energize kiln and calciner of
the BUA cement factory.
LOCATION: Okpella Edo State
DURATION: 2014 – 2016
CLIENT: Nigeria Gas Company(NGC))
ASSIGNMENT:-Construction of accommodation buildings, Utilities
facility, Electrical works and Installation of kitchen, Sewage & Water
treatment facilities, construction of Slipway/jetty, internal road/External
road and fabrication & installation of diesel pipe line .
The structural works include the Single & Double bedroom buildings, office
complex, Fuel bay, Slip way jetty, Sewage treatment plant, Water treatment plant
and Multi-purpose mess hall including installation of all the relevant equipments
and furniture for the various building. Civil works include the provision of a road
network, drainage facilities, Car parks, and other building services within the project site












BRIEF DESCRIPTION
This project is being undertaken by the key personnel of Skyradar
Engineering Nigeria Limited are listed below.
PROJECT: Construction of water treatment plant for power generation.
LOCATION: Okpai Delta State
DURATION: 2011- 2014
CLIENT: AGIP/NECCODIETSMAN
ASSIGNMENT:-Construction of concrete sedimentary basin,
clarifloculator tank, sludge thickener & sludge dryer building, clarify
water building, multi media filter foundation & plinths, underground clear
well tank, control and chemical building and external concrete floor,
laying of pipes to hook up to the existing main line,
The estimated cost of the project is N850,000,000.00 (Eight
Hundred and fifty million naira).
.






BRIEF DESCRIPTION
Construction of new class room and renovation of existing school
building within Owu and Ako Oko community Abeokuta, Oun state.
Client:- Ogun State Community Based Urban Development
Project
World Bank Assisted Project, Abeokuta, Ogun State.
Assignment:- Construction/Rehablitation of school buildings, &
other Facilities.
The Scope of Work include Construction of new class room building
(Bungalow & Storey), Rehabilitation of existing delabilitated buildings, Construction of
Toilets buildings and Plumbing work, Electrical works, Drainage network and car park.
The Estimated cost of the project is N192,000,000.00. (One Hundred
and Ninety two Million Naira).






BRIEF DESCRIPTION
SITE LAYOUT OF OLOKOLA LIQUIFIED NATURAL GAS(OKLNG), ODE-OMI, OGUN STATE
Jobs currently being undertaken by the key personnel of Skyradar
Engineering Nigeria Limited are listed below.
(A) Construction of pioneer camp and Utilities facility(EPC) in progress
Client:- Olokola Liquified Natural Gas(OKLNG)
Assignment:-Construction of accommodation buildings, Utilities
facility, Electrical works and Installation of kitchen, Sewage & Water treatment
facilities, construction of Slipway/jetty, internal road/External road and
fabrication & installation of diesel pipe line .
The structural works include the Single & Double bedroom buildings, office
complex, Fuel bay, Slip way jetty, Sewage treatment plant, Water treatment plant
and Multi-purpose mess hall including installation of all the relevant equipments
and furniture for the various building. Civil works include the provision of a road
network, drainage facilities, Car parks, and other building services within the
complex.
The estimated cost of the project is N6,000,000,000.00 (Six Billion naira).