Construction Projects

BRIEF DESCRIPTION

Jobs being undertaken by the key personnel of Skyradar Engineering
Nigeria Limited are listed below.
(A) PROJECT: Construction of Gas Station to power energize kiln and calciner of
the BUA cement factory.
LOCATION: Okpella Edo State
DURATION: 2014 – 2016
CLIENT: Nigeria Gas Company(NGC))
ASSIGNMENT:-Construction of accommodation buildings, Utilities
facility, Electrical works and Installation of kitchen, Sewage & Water
treatment facilities, construction of Slipway/jetty, internal road/External
road and fabrication & installation of diesel pipe line .
The structural works include the Single & Double bedroom buildings, office
complex, Fuel bay, Slip way jetty, Sewage treatment plant, Water treatment plant
and Multi-purpose mess hall including installation of all the relevant equipments
and furniture for the various building. Civil works include the provision of a road
network, drainage facilities, Car parks, and other building services within the project site

Pig receiver pipe at Okpella
Steel roofing of the valve pit ongoing
Formwork for retaining wall around 36 inches line hot tap point
Hot tap zone
Valve pit concrete and piping work at Ibie completed
Felting of the NGC concrete roof at Okpella
Walk way and Granite fill of the site layout
Pig launcher station at Ebele 50m distance from the hot tap region
kiln & calciner yard at BUA cement plan at Okpella
Gas station, concrete skid, floor & piping hook up
Earth work for trailer park at Bua cement factory
Steel roof for 24inches gas line concrete trench at hot tap area for BUA cement at Ebele

BRIEF DESCRIPTION

This project is being undertaken by the key personnel of Skyradar
Engineering Nigeria Limited are listed below.
PROJECT: Construction of water treatment plant for power generation.
LOCATION: Okpai Delta State
DURATION: 2011- 2014
CLIENT: AGIP/NECCODIETSMAN
ASSIGNMENT:-Construction of concrete sedimentary basin,
clarifloculator tank, sludge thickener & sludge dryer building, clarify
water building, multi media filter foundation & plinths, underground clear
well tank, control and chemical building and external concrete floor,
laying of pipes to hook up to the existing main line,
The estimated cost of the project is N850,000,000.00 (Eight
Hundred and fifty million naira).
.

Sludge thickener& sedimentary tank
Clarify well tank & building
Clarifloculator tank
Control & chemical building

BRIEF DESCRIPTION

Construction of new class room and renovation of existing school
building within Owu and Ako Oko community Abeokuta, Oun state.
Client:- Ogun State Community Based Urban Development
Project
World Bank Assisted Project, Abeokuta, Ogun State.
Assignment:- Construction/Rehablitation of school buildings, &
other Facilities.
The Scope of Work include Construction of new class room building
(Bungalow & Storey), Rehabilitation of existing delabilitated buildings, Construction of
Toilets buildings and Plumbing work, Electrical works, Drainage network and car park.
The Estimated cost of the project is N192,000,000.00. (One Hundred
and Ninety two Million Naira).

Layout
Type 1 classroom building
Type 2 building
Layout
Type 1 classroom building
Type 2 building

BRIEF DESCRIPTION

SITE LAYOUT OF OLOKOLA LIQUIFIED NATURAL GAS(OKLNG), ODE-OMI, OGUN STATE
Jobs currently being undertaken by the key personnel of Skyradar
Engineering Nigeria Limited are listed below.
(A) Construction of pioneer camp and Utilities facility(EPC) in progress
Client:- Olokola Liquified Natural Gas(OKLNG)
Assignment:-Construction of accommodation buildings, Utilities
facility, Electrical works and Installation of kitchen, Sewage & Water treatment
facilities, construction of Slipway/jetty, internal road/External road and
fabrication & installation of diesel pipe line .
The structural works include the Single & Double bedroom buildings, office
complex, Fuel bay, Slip way jetty, Sewage treatment plant, Water treatment plant
and Multi-purpose mess hall including installation of all the relevant equipments
and furniture for the various building. Civil works include the provision of a road
network, drainage facilities, Car parks, and other building services within the
complex.
The estimated cost of the project is N6,000,000,000.00 (Six Billion naira).

SITE LAYOUT OF OLOKOLA LIQUIFIED NATURAL GAS(OKLNG), ODE-OMI, OGUN STATE
Filling of sub base and grading work at OKLNG pioneer camp road
Compaction of the road and laying of geotextile membrane in OKLNG pioneer camp
Stone base fill, grading & compaction of road in OKLNG pioneer camp
Electrification of flood light in OKLNG pioneer camp.
Aerial photograph of mess hall and security building.